| Scope of delivery and services | Client |
| Evaporator diaphragm wall replacement; supply and installation Swirler, Power plant Schkopau, Germany, 2022 | Saale Energie |
| Disassembly and assembly of the deflection line 1+2, Power plant Schkopau, Germany, 2022 | Saale Energie |
| Steam generator plant for auxiliary steam supply of units A to D of the Jänschwalde power plant, engineering and preparation for approval; manufacture, delivery, erection and commissioning and trial operation, Power plant Jänschwalde, Germany, 2022 | LEAG |
| Material supply for rehabilitation superheater 4, Power plant Schkopau, Germany, 2022 | Saale Energie |
| Study on biomass co-combustion (preparation for contract), Power plant Schkopau, Germany, 2022 | Saale Energie |
| Burner diagnostics and boiler overhaul, Power plant Heyden, Germany, 2022 | Uniper |
| Study for the adjustment of the steam parameters, Power plant Klingenberg, Germany, 2022 | Vattenfall |
| Partial heating surface replacement evaporator inclined tube block A, Power plant Schwarze Pumpe, Germany, 2021 | LEAG |
| Delivery/assembly of injection cooler and boiler corners, Power plant Heyden, Germany, 2021 | Uniper |
| Production and assembly casting arch truss Drawing option 2, Steel plant Eisenhüttenstadt, Germany, 2021 | ArcelorMittal Eisenhüttenstadt |
| Partial heating surface change Block R Downstream heating surfaces, Power plant Lippendorf, Germany, 2020 | LEAG |
| Delivery superheater 4, Power plant Schkopau, Germany, 2020 | Uniper |
| Delivery quads, hopper and evaporator renovation, Power plant Schkopau, Germany, 2020 | Uniper |
| Revision pulverized coal burner, Power plant Heyden, Germany, 2020 | Uniper |
| Partial heating surface changeover Downstream heating surfaces, Power plant Lippendorf, Germany, 2020 | LEAG |
| Refurbishment hopper and evaporator, Power plant Schkopau, Germany, 2020 | Uniper |
| Delivery material superheater 4, Power plant Schkopau, Germany, 2020 | Uniper |
| Engineering supply and installation ABL retrofit (Nox reduction), Power plant Boxberg, Germany, 2019 | LEAG |
| Change of downstream heating surfaces, Power plant Lippendorf, Germany, 2019 | LEAG |
| Fabrication and assembly casting arch truss, Steel plant Eisenhüttenstadt, Germany, 2019 | ArcelorMittal Eisenhüttenstadt |
| Delivery quads, hopper and evaporator renovation, Power plant Schkopau, Germany, 2019 | Uniper |
| Internal test DE 51 and 52, Gas power plant Irsching, Germany, 2019 | Uniper |
| Investigation of furnace optimization to reduce the costs of start-up and shut-down processes using own pulverized coal, Study, UNIPER, 2018 | Germany |
| TÜV Revision Boiler 3 and 4, Power plant Ingolstadt, Germany, 2018 | UNIPER |
| Research project activated carbon fixed-bed filter, Study, Germany, 2017 | LEAG |
| Renewal steam line 4 and 16 bar, Heating power plan Guben, Germany, 2017 | ENVIA Therm Chemnitz |
| Optimization of casthouse dedusting at blast furnace 2 (installation and commissioning), Steel plant Bremen, Germany, 2017 | ArcelorMittal |
| Investigation/optimization of the maintenance effort during the main overhaul in 2022 at units A and B at Schwarze Pumpe power plant, Study, Germany, 2017 | LEAG |
| Ensuring the auxiliary steam supply or the start-up process at the Jänschwalde power plant site, Study, Germany , 2017 | LEAG |
| Partial renovation VHF inclined pipe and funnel Partial renovation superheat 4, Power plant Lippendorf, Block R, Germany, 2017 | LEAG |
| Delivery of pressure part components, Power plant Jänschwalde, Block A, Germany, 2017 | LEAG |
| Planning, delivery and assembly Evaporator corners and Revision / repair of pulverized coal burners, Power plant Heyden, Block 4, Germany, 2017 | UNIPER |
| Installation and commissioning of tipping trough hoods and dust extraction lines Casting halls 1 and 2, Steel plant Bremen, blast furnace 2, Germany, 2017 | ArcelorMittal Bremen |
| Rehabilitation elevated tank 2, Steel plant Bremen, Germany, 2017 | ArcelorMittal |
| Planning, delivery, commissioning of a mercury catalysis test plant, Power plant Boxberg, Block Q , Germany, 2016 | LEAG |
| Planning, delivery, assembly for exchange evaporator funnel, Power plant Schkopau, Block B, Germany, 2016 | UNIPER |
| Investigation of technical measures for the future operation of the existing lignite-fired power plants of Vattenfall Europe Generation, taking into account the market-calculated flexibility requirements., Study, Germany, 2016 | Vattenfall |